Irine Jeptum, Bancy Mbura Mati, John Mwangi Gathenya and Michael Thomas. Effects of Water Abstraction on Burguret Flows, Kenya.
. 2018; 6(5):189-202. doi: 10.12691/AJWR-6-5-2
Burguret catchment, river water abstractions, flow duration curves, Mike Hydro Model
This work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit
[1] | Aeschbacher, J., Liniger H. P. and Weingartner R. (2005): Increasing water-shortage in the Mount Kenya region – a case study of a typical highland-lowland system. Mountain Research and Development journal 25(2); 155-162. |
|
[2] | Water Resource Management (Amendments) Rules, (2012). L.N No. 105 of 2012. Food and Agriculture Organization of United Nations. |
|
[3] | Rural Focus Ltd, (2012). Summary Report of Legal Status and Water Abstraction along Burguret River, in Burguret Sub-Catchment, Upper Ewaso Ngiro Basin. Unpublished report. |
|
[4] | Wisser, D. (2004). Water Management Methodologies for Water Deficient Regions in Southern Europe. Deliverables_21_3. |
|
[5] | Michael, K.T., www.worldlakes.org/uploads/kenya_river.htm |
|
[6] | Mutiga, J. K., Mavengano, S. T., Su, Z., Woldai, T. and Becht, R. (May 2010b). Water allocation as a planning tool to minimize water use conflicts in the Upper Ewaso Ng’iro Basin, Kenya. Water resource management journal. (24) Pp. 3939-3959. |
|
[7] | FAO, (2011a). Final draft, Land Degradation Assessment in Drylands, LADA Project. Pg 1-195. |
|
[8] | Tingyi, L. (2007). Research of domestic water consumption: a field study in Harbin, China. Msc. Thesis, Department of Civil and Building Engineerin, Loughborough University. Pg 1-89. |
|
[9] | FAO, (2011b). Section 6, Water resources assessment. Manual for local level assessment of land degradation, sustainable land management and livelihoods. Part 2 field methodology and tools. Pg 1-14. |
|
[10] | Wang, L. Z., Fan, L. and Hipel, K. W. (2003). Water Resources Allocation. A Cooperative Game Theoretic Approach. Journal of Environmental Informatics. 2(2): 11-22. |
|
[11] | MIKE by DHI, (2017). Mike Hydro Basin, User Guide. Danish Hydraulic Institute, Denmark. Pg 1-214. |
|
[12] | NRM3, (2004). Baseline water resource survey for Burguret River. Unpublished final draft report, pg. 1-53. |
|
[13] | Searcy, J. K. (1959). Flow Duration Curves. Manual of Hydrology Part 2 Low-Flow Technique. Geological Survey Water-Supply Paper 1542-A. |
|
[14] | Vogel, R. and Fennessey, N. (1995). Flow Duration Curves II: A review of applications in water resources planning. Water Resources Bulletin, 31 (6), 1029-1039. |
|
[15] | McKay, S. K. and Fischenich, J. C. (2016). Development and Application of Flow Duration Curves for Stream Restoration. Ecosystem Management and Restoration Research Program. EBA Technical Notes Collection. ERDC TN-EMRRP-SR-49. |
|
[16] | Madsen, H. (2000). Automatic calibration of a conceptual rainfall–runoff model using multiple objectives. Journal of Hydrology. (235), Pg. 276-288. |
|
[17] | NRM3, (2003). Baseline water resource survey for Burguret River. Unpublished 2nd draft report, pg. 1-114. |
|
[18] | NRM3, (2002). Water Abstractions Monitoring Campaign for the Burguret River, Upper Ewaso Ngiro Basin. Water Resource Management Journal, pg. 1-34. |
|
[19] | Thomas, M., Hope, R., Traexler, T. and Njenga, J. (Jan, 2014). What is the value of being smart? - Evidence from mobile enabled water resource monitoring on the Burguret River, Kenya. Unpublished draft report. |
|
[20] | Mike by DHI, (2014). Nile Basin Decision Support System, Mike Hydro modeling Tools Training module. Pg 1-116. |
|
[21] | Deckers, D. L. (2006). Predicting discharge at ungauged catchments. Civil Engineering and Management Enschede, University of Twente. MSc Thesis. |
|
[22] | Water Resource Management Rules, (2007). L.N No. 171 of 2007. Food and Agriculture Organization of United Nations. |
|