Skip Navigation Links.
Collapse <span class="m110 colortj mt20 fontw700">Volume 12 (2024)</span>Volume 12 (2024)
Collapse <span class="m110 colortj mt20 fontw700">Volume 11 (2023)</span>Volume 11 (2023)
Collapse <span class="m110 colortj mt20 fontw700">Volume 10 (2022)</span>Volume 10 (2022)
Collapse <span class="m110 colortj mt20 fontw700">Volume 9 (2021)</span>Volume 9 (2021)
Collapse <span class="m110 colortj mt20 fontw700">Volume 8 (2020)</span>Volume 8 (2020)
Collapse <span class="m110 colortj mt20 fontw700">Volume 7 (2019)</span>Volume 7 (2019)
Collapse <span class="m110 colortj mt20 fontw700">Volume 6 (2018)</span>Volume 6 (2018)
Collapse <span class="m110 colortj mt20 fontw700">Volume 5 (2017)</span>Volume 5 (2017)
Collapse <span class="m110 colortj mt20 fontw700">Volume 4 (2016)</span>Volume 4 (2016)
Collapse <span class="m110 colortj mt20 fontw700">Volume 3 (2015)</span>Volume 3 (2015)
Collapse <span class="m110 colortj mt20 fontw700">Volume 2 (2014)</span>Volume 2 (2014)
Collapse <span class="m110 colortj mt20 fontw700">Volume 1 (2013)</span>Volume 1 (2013)
American Journal of Water Resources. 2018, 6(5), 189-202
DOI: 10.12691/AJWR-6-5-2
Original Research

Effects of Water Abstraction on Burguret Flows, Kenya

Irine Jeptum1, , Bancy Mbura Mati2, John Mwangi Gathenya1 and Michael Thomas3

1Department of Soil Water and Environmental Engineering (SWEE), Jomo Kenyatta University of Agriculture and Technology (JKUAT) Kenya

2Water Research and Resources Centre (WARREC), Jomo Kenyatta University of Agriculture and Technology (JKUAT), Kenya

3Rural Focus Ltd, Kenya

Pub. Date: November 20, 2018

Cite this paper

Irine Jeptum, Bancy Mbura Mati, John Mwangi Gathenya and Michael Thomas. Effects of Water Abstraction on Burguret Flows, Kenya. American Journal of Water Resources. 2018; 6(5):189-202. doi: 10.12691/AJWR-6-5-2

Abstract

The water flows of Burguret River, located on the slopes of Mt. Kenya in Burguret catchment, were assessed along the profile to determine the water abstraction status. Downstream water users are faced with challenges of low river flows or no flows during the dry season which leads to a lot of conflicts arising due to the water allocation in these areas. Methods used for assessment of water abstraction included field survey visit to ascertain abstraction points details, the water users’ interviews in which convenience and random sampling methods were used. Flow duration curves, fdcs were developed from the observed river flow discharge to ascertain the water supply of Burguret River and finally Mike Hydro model was used to predict optimal flows for water allocation within Burguret catchment. Majority of upstream abstractions used gravity pipes and abstracted large amounts, 14,502 m-3day (67%) of water compared to downstream users who mostly used portable pumps and abstracted 2,696 m-3day (16%). The unofficial abstractions took place when abstractors exceed the allocated amounts. Burguret River can supply 21,953 m-3day and 10,800 m-3day during normal flows from the Naturalized and Observed fdcs respectively. The Nash Sutcliffe Efficiency, R2 was found to be 0.71 and 0.61 during calibration and validation periods respectively. This showed that the model performed well and was used to adequately simulate scenarios which yielded results after optimal allocation and the river supply stood at 15,984 m-3day which was good enough to ensure downstream and environmental flows are restored.

Keywords

Burguret catchment, river water abstractions, flow duration curves, Mike Hydro Model

Copyright

Creative CommonsThis work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/

References

[1]  Aeschbacher, J., Liniger H. P. and Weingartner R. (2005): Increasing water-shortage in the Mount Kenya region – a case study of a typical highland-lowland system. Mountain Research and Development journal 25(2); 155-162.
 
[2]  Water Resource Management (Amendments) Rules, (2012). L.N No. 105 of 2012. Food and Agriculture Organization of United Nations.
 
[3]  Rural Focus Ltd, (2012). Summary Report of Legal Status and Water Abstraction along Burguret River, in Burguret Sub-Catchment, Upper Ewaso Ngiro Basin. Unpublished report.
 
[4]  Wisser, D. (2004). Water Management Methodologies for Water Deficient Regions in Southern Europe. Deliverables_21_3.
 
[5]  Michael, K.T., www.worldlakes.org/uploads/kenya_river.htm
 
[6]  Mutiga, J. K., Mavengano, S. T., Su, Z., Woldai, T. and Becht, R. (May 2010b). Water allocation as a planning tool to minimize water use conflicts in the Upper Ewaso Ng’iro Basin, Kenya. Water resource management journal. (24) Pp. 3939-3959.
 
[7]  FAO, (2011a). Final draft, Land Degradation Assessment in Drylands, LADA Project. Pg 1-195.
 
[8]  Tingyi, L. (2007). Research of domestic water consumption: a field study in Harbin, China. Msc. Thesis, Department of Civil and Building Engineerin, Loughborough University. Pg 1-89.
 
[9]  FAO, (2011b). Section 6, Water resources assessment. Manual for local level assessment of land degradation, sustainable land management and livelihoods. Part 2 field methodology and tools. Pg 1-14.
 
[10]  Wang, L. Z., Fan, L. and Hipel, K. W. (2003). Water Resources Allocation. A Cooperative Game Theoretic Approach. Journal of Environmental Informatics. 2(2): 11-22.
 
[11]  MIKE by DHI, (2017). Mike Hydro Basin, User Guide. Danish Hydraulic Institute, Denmark. Pg 1-214.
 
[12]  NRM3, (2004). Baseline water resource survey for Burguret River. Unpublished final draft report, pg. 1-53.
 
[13]  Searcy, J. K. (1959). Flow Duration Curves. Manual of Hydrology Part 2 Low-Flow Technique. Geological Survey Water-Supply Paper 1542-A.
 
[14]  Vogel, R. and Fennessey, N. (1995). Flow Duration Curves II: A review of applications in water resources planning. Water Resources Bulletin, 31 (6), 1029-1039.
 
[15]  McKay, S. K. and Fischenich, J. C. (2016). Development and Application of Flow Duration Curves for Stream Restoration. Ecosystem Management and Restoration Research Program. EBA Technical Notes Collection. ERDC TN-EMRRP-SR-49.
 
[16]  Madsen, H. (2000). Automatic calibration of a conceptual rainfall–runoff model using multiple objectives. Journal of Hydrology. (235), Pg. 276-288.
 
[17]  NRM3, (2003). Baseline water resource survey for Burguret River. Unpublished 2nd draft report, pg. 1-114.
 
[18]  NRM3, (2002). Water Abstractions Monitoring Campaign for the Burguret River, Upper Ewaso Ngiro Basin. Water Resource Management Journal, pg. 1-34.
 
[19]  Thomas, M., Hope, R., Traexler, T. and Njenga, J. (Jan, 2014). What is the value of being smart? - Evidence from mobile enabled water resource monitoring on the Burguret River, Kenya. Unpublished draft report.
 
[20]  Mike by DHI, (2014). Nile Basin Decision Support System, Mike Hydro modeling Tools Training module. Pg 1-116.
 
[21]  Deckers, D. L. (2006). Predicting discharge at ungauged catchments. Civil Engineering and Management Enschede, University of Twente. MSc Thesis.
 
[22]  Water Resource Management Rules, (2007). L.N No. 171 of 2007. Food and Agriculture Organization of United Nations.